Preliminary solar panel wiring going in today
Posted By |
Message |
GoldenRod
10 years on LIF!
Member since 11/06 26792 total posts
Name: Shawn
|
Preliminary solar panel wiring going in today
The solar panel installer is at the house running wires from the roof to the basement in preparation for the panels. The house has no insulation, siding or drywall, so it's the ideal time to run wires so they are out of sight. Makes everything look cleaner and more professional that way.
Panels aren't due to arrive until January, though..
|
Posted 10/2/08 9:55 AM |
|
|
Prudential Douglas Elliman Real Estate
Long Island's Largest Bridal Resource | Long Island Weddings |
smdl
I love Gary too..on a plate!
Member since 5/06 32461 total posts
Name: me
|
Re: Preliminary solar panel wiring going in today
It's all in the planning!!!
Any news pics of the project?
|
Posted 10/2/08 10:16 AM |
|
|
JldDolphin
Member since 1/07 6929 total posts
Name: Jen
|
Re: Preliminary solar panel wiring going in today
|
Posted 10/2/08 10:21 AM |
|
|
GoldenRod
10 years on LIF!
Member since 11/06 26792 total posts
Name: Shawn
|
Re: Preliminary solar panel wiring going in today
Posted by smdl
It's all in the planning!!!
Any news pics of the project?
Most of the latest changes are relatively minor, from a photo point of view. There's some rough plumbing in for the bathroom. The opened up the stair wall so the first 5 steps don't have a wall anymore. They'll eventually get a railing. Electrical is pretty much done for living space. (Still need outlets in basement, need the subpanel installed, and a few other minor things.)
|
Posted 10/2/08 11:03 AM |
|
|
Potentially Related Topics:
Currently 143036 users on the LIFamilies.com Chat
|