How long did it take and how long were you left without the use of your stove and sink?
I know there are variations and every case is different... They are beginning Monday; I am anticipating 4-6 weeks from start to finish and I would like to estimate how long I'll be bbqing, eating take-out, and throwing myself on the mercy of friends and family
|
Posted 5/14/15 11:36 AM |
|
|
Long Island Weddings
Long Island's Largest Bridal Resource | Prudential Douglas Elliman Real Estate |
Jenhos
Maeve
Member since 6/05 3273 total posts
Name:
|
Re: If you had your kitchen totally ripped out and renovated...
4 weeks down to the studs, change of layout
|
Posted 5/14/15 3:01 PM |
|
|
TheWhiteRabbit
Thru the rabbit hole!
Member since 7/06 4412 total posts
Name:
|
Re: If you had your kitchen totally ripped out and renovated...
I can let you know in a few weeks, they just gutted our entire kitchen today.
Funny, it took them 4 hours to demolish the entire thing, but I'm guessing it will be at least 3 - 4 weeks. I'm being optimistic!!!
I'll keep you posted
Our fridge is on the deck
ETA: Oh, I see you're starting Monday, we will go through it together
Message edited 5/14/2015 3:22:37 PM.
|
Posted 5/14/15 3:15 PM |
|
|
DaniJude
You're My Home <3
Member since 11/06 14815 total posts
Name: Danielle
|
Re: If you had your kitchen totally ripped out and renovated...
My parents -- four weeks.
|
Posted 5/14/15 3:28 PM |
|
|
jessnbrian
Only God knows His plan for us
Member since 4/13 7238 total posts
Name: Jessica
|
If you had your kitchen totally ripped out and renovated...
We did it in 2 shifts. The first we gutted & re-did the floor, then we reattached the stove and sink, and a year later we did the rest. Were we to have done it all in one shot, my guess would have been 5-6 weeks. But this was a MASSIVE project.
|
Posted 5/14/15 3:44 PM |
|
|
2girlsforme
LIF Adult
Member since 8/06 3071 total posts
Name: XXXXXXXXX
|
Re: If you had your kitchen totally ripped out and renovated...
4 weeks....
|
Posted 5/14/15 5:58 PM |
|
|
DreamHouse
LIF Infant
Member since 2/13 87 total posts
Name: finally!
|
Re: If you had your kitchen totally ripped out and renovated...
I would plan for at least 6 weeks.
Message edited 5/15/2015 10:59:53 AM.
|
Posted 5/15/15 10:58 AM |
|
|
Eireann
Two ladies and a gentleman!
Member since 5/05 12165 total posts
Name:
|
Re: If you had your kitchen totally ripped out and renovated...
Yes, I'm thinking most likely 6...
So am I to understand that for the duration of the project--no matter how long it takes--I will be without the use of my stove and sink? That's my main question, really.
|
Posted 5/15/15 11:56 AM |
|
|
babyface10
LIF Adolescent
Member since 3/11 804 total posts
Name:
|
If you had your kitchen totally ripped out and renovated...
We did most ourselves. New insulation sheetrock. We changed vents, electrical, windows, doors and piping and were done in 2 weeks.
|
Posted 5/15/15 12:55 PM |
|
|
|
Re: If you had your kitchen totally ripped out and renovated...
4 weeks
|
Posted 5/15/15 2:03 PM |
|
|
|
Re: If you had your kitchen totally ripped out and renovated...
Posted by Eireann
Yes, I'm thinking most likely 6...
So am I to understand that for the duration of the project--no matter how long it takes--I will be without the use of my stove and sink? That's my main question, really.
No as we were able to use ours before the end of the 4 weeks as they tried to get those in as quick as possible.
|
Posted 5/15/15 2:03 PM |
|
|
luvmotherhood
california dreamin'
Member since 2/13 1443 total posts
Name: love my family!
|
If you had your kitchen totally ripped out and renovated...
Ours is just being finished. It took 3 and a half weeks.
|
Posted 5/16/15 11:00 PM |
|
|
LulaBell
:)
Member since 1/06 3508 total posts
Name: J
|
If you had your kitchen totally ripped out and renovated...
Cabinets were ripped out end of June, project wasn't done until the end of August, but we had a stove, sink, fridge for all but three weeks. It should not have taken that long but we got a deal w our contractor and knew it would take longer than normal. We also had to redo all floors on the first floor which added a week to the project.
|
Posted 5/17/15 8:47 AM |
|
|
|
Re: If you had your kitchen totally ripped out and renovated...
If you have all your materials there, it should be quick. If you are waiting for cabinets or tile then it could take longer.
|