How long to finish a basement?
If you've finished a basement completely, how long did the process take from start to finish? I mean a completely bare basement to finish. And how big was the space?
Thanks!
|
Posted 7/17/14 8:56 PM |
|
|
Prudential Douglas Elliman Real Estate
Long Island's Largest Bridal Resource | Long Island Weddings |
aliwnec10
mom of 3 boys
Member since 4/06 11426 total posts
Name: Ali
|
Re: How long to finish a basement?
i'd like to know the answer to this too.
|
Posted 7/17/14 9:07 PM |
|
|
|
Re: How long to finish a basement?
We did half of our basement, including new interior stairs and a half bath. Took them about 7 work days. Some days were half days though.
|
Posted 7/17/14 10:56 PM |
|
|
Christy359
LIF Infant
Member since 10/06 116 total posts
Name: Christy
|
Re: How long to finish a basement?
Ours took 2 months start to finish from bare bones to painted.
However, a lot of those days were half days (spackle days, mostly) or no-show days. If they had come every single day, I'd say 6 weeks max.
|
Posted 7/18/14 8:32 AM |
|
|
Christy359
LIF Infant
Member since 10/06 116 total posts
Name: Christy
|
Re: How long to finish a basement?
Missed the second part - the raw space was 40 x 27, but we didn't finish 1/4 of it. That 1/4 became the laundry room. So, maybe 800 sq ft finished space.
Message edited 7/18/2014 8:35:07 AM.
|
Posted 7/18/14 8:34 AM |
|
|
Bearcat
Love my little girls!!! <3
Member since 6/10 10818 total posts
Name: E
|
Re: How long to finish a basement?
Ours was just completed. Took 6 weeks but the first week was demo of existing poorly finished space - so they gutted it to the foundation walls. Roughly 5 weeks from there. Approx 1100 sq.ft.
ETA: a big chunk of the time was installing a full size egress window. which, aside from being necessary to comply with municipal regulations, was really a great addition - adds SO much natural light down there.
Message edited 7/20/2014 9:30:45 PM.
|
Posted 7/18/14 10:56 AM |
|
|
Songwriter76
LIF Adult
Member since 4/08 902 total posts
Name: David
|
Re: How long to finish a basement?
One week for this.
If you have professionals doing the work, I don't think a basement should take more than that.
Image Attachment(s):
Message edited 7/18/2014 12:41:29 PM.
|
Posted 7/18/14 12:40 PM |
|
|
Songwriter76
LIF Adult
Member since 4/08 902 total posts
Name: David
|
Re: How long to finish a basement?
Message edited 7/18/2014 12:42:25 PM.
|
Posted 7/18/14 12:42 PM |
|
|
Cheeks24
Living a dream
Member since 1/08 8589 total posts
Name: Cheeks
|
How long to finish a basement?
It really depends on what you're planning to do with it. Just basic work should be about a week.
|
Posted 7/18/14 1:17 PM |
|
|
nferrandi
too excited for words
Member since 10/05 18538 total posts
Name: Nicole
|
Re: How long to finish a basement?
Ours took 3 weeks. We took a two car garage and had to build up a sub floor, lots of closets for storage, a half bath, build walls, all new lighting, carpeting. It was a lot if work. We thought the timing was great considering how much we had to do down there.
|
Posted 7/19/14 9:22 AM |
|
|
Irishgrl13
Fingers Crossed...
Member since 6/09 1301 total posts
Name: Colleen
|
Re: How long to finish a basement?
We completed our entire basement (about 1200 square feet) in about 7 weeks... It went from concrete walls and floor to sheetrock, full bath, bedroom, built in bar, ceiling tiles, carpet, wood flooring in a small section, installation of egress window etc. Soup to nuts, about 7 weeks...
|
Posted 7/20/14 10:28 AM |
|
|
cets1290
LIF Adult
Member since 6/14 1051 total posts
Name:
|
How long to finish a basement?
Can anyone recommend who they used and costs (if comfortable telling me that info!) :) send me a FM if you wish to share! We are looking to finish our basement for our wideline cape, so it's a large space that is being unused right now.. would love to be able to use the space soon
|
Posted 8/14/14 9:02 AM |
|
|
JDubs
different, not less
Member since 7/09 13160 total posts
Name:
|
Re: How long to finish a basement?
we had help from family and did most of it ourselves except for sheetrocking and putting down flooring. I want to say it took 2 months.
|
Posted 8/14/14 9:19 AM |
|
|
DiamondGirl
You are my I love you
Member since 7/09 18802 total posts
Name: DiamondMama
|
How long to finish a basement?
We are doing our 950 sq ft basement, waterproofing, tile, sheetrock, ceilings, tile floor, bath, wet bar and guy estimated 3 weeks.
|
Posted 8/14/14 9:57 AM |
|
|
|
Re: How long to finish a basement?
Ours is 1800 sq.If I had to add up the time from various people who worked on it, including my DH's time and mine. I would say 6/7 weeks. That included waiting for inspections. The drywall alone took 7 days between bringing the material down which took a few hours, waiting for the spackel to dry and labor. We installed laminate flooring, that took about 4 days. The electrical took about 10 days ( we have a lot of lights)
In actuality we started in January and finished in May. The 6/7 weeks is if I added up all the time back to back.
|
Posted 8/15/14 9:13 AM |
|
|